Saturday, January 22, 2011

Lever Prep & Installation

Got the levers prepped and installed. Will move on to final soldering tomorrow. Here are some snaps of the prep and final install. This might be a keeper for future transmitters!
Final install and thanks to George at Orca Waterjet
Brush finishing sides

Hole is intentionally undersized in waterjet and reamed to size

Tap routine ;-)
Drill 'em right!

No comments:

Post a Comment